作者:W Liu · 被引用次数:5 — algorithm to solve the crane scheduling problem. Using steel plant's actual data for a digital simulation,. Results show that this software can
Request PDF | Optimizing the Steel Plate Storage Yard Crane Scheduling Problem Using a Two Stage Planning/Scheduling Approach | This paper presents the
作者:S KUYAMA · 2016 · 被引用次数:1 — The proposed method consisted of scheduling optimization and logistics simulation. Computational simulation was conducted with operation data in JFE Steel,
作者:F Yuan · 2020 — Crane scheduling; Bayesian network; dynamic area allocation; simulation system; steelworks. 1. Introduction. The steel industry is the key
作者:F Yuan · 2020 — Crane scheduling tasks in steelworks are a matter of uncertainty scheduling with certain probability distribution pattern. To better schedule tasks with this feature,
作者:GN Maschietto · 2016 · 被引用次数:3 — This article proposes a mixed integer model and a genetic algorithm to address a two cranes scheduling problem with non-interference constraints. The problem
作者:S Kuyama · 2013 · 被引用次数:2 — (e-mail: [email protected]). Abstract: In this paper, a two-phase heuristic algorithm is proposed for an expanded crane scheduling problem that
The scheduling of overhead crane movements is an optimization problem, given the data of a encountered in real warehouse operations in steel companies'.
The research works show that the simulation method of crane scheduling in workshop of steel-making plant based on MAS is feasible, and it can depict the basic
作者:V Galle · 被引用次数:34 — Moreover, it appears to only apply to the special problem of steel plants which consider low stacks hence few relocations per request. Our work contributes to the
作者:SJ Mason · 被引用次数:28 — the quay crane scheduling problem (QCSP). The goal is to assign and exploration was performed by a “manual” simulation- gradually cooling the metal.
作者:AZ TORK · 2013 · 被引用次数:5 — Current methods for crane operation scheduling are manual, time consuming and do type of material (e.g., loading steel bars needs more hoisting height than
2018年6月3日 — traveling (EOT) cranes in its steel melting shops. and with the help of the OEM manual, a chart was made for each the hot metal cranes of LD2 and LD3. Fig. 7 time-based maintenance (TBM) schedule and condi-.
作者:X Xie · 2018 — In this paper, we deal with a three-crane integrated scheduling problem arising in a finery shop of an iron and steel making enterprise. It is commonly occurred in
作者:J Hansen · 2002 · 被引用次数:6 — OSS produces the worlds largest container ships. The first process of producing the steel ships is handling arrival and storage of steel plates until